{"id":124,"date":"2020-12-12T10:34:12","date_gmt":"2020-12-12T10:34:12","guid":{"rendered":"http:\/\/webcomipl.net\/aegclwp\/?page_id=124"},"modified":"2021-02-18T18:09:55","modified_gmt":"2021-02-18T12:39:55","slug":"aiib-tenders","status":"publish","type":"page","link":"https:\/\/www.aegcl.co.in\/as\/aiib-tenders\/","title":{"rendered":"\u098f\u0986\u0987\u0986\u0987\u09ac\u09bf \u09a8\u09bf\u09ac\u09bf\u09a6\u09be"},"content":{"rendered":"<table class=\"table table-bordered tender-table\">\n<thead>\n<tr>\n<th scope=\"col\">Sl. No.<\/th>\n<th scope=\"col\">Tender Details<\/th>\n<th scope=\"col\">Key Dates<\/th>\n<th scope=\"col\">Download<\/th>\n<th scope=\"col\">Remarks<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<th scope=\"row\">13<\/th>\n<td width=\"35%\"><b><u> RFB NO:AEGCL\/AIIB\/ERP\/PACKAGE-N1\/38 Dated. 13\/01\/2021<\/u><\/b><br \/>\nProcurement of Supply, Configuration, Integration, Installation, Implementation &amp; Support of ERP Software (hereafter ERP System) for AEGCL, Assam, India.<\/td>\n<td width=\"33%\"><u><b>Tender start date:<\/b><\/u>13.01.2021<br \/>\n<u><b>Tender end date\/time:<\/b><\/u>On or before 01\/03\/2021 15:00 Hrs (IST)<br \/>\n<u><b>Tender Opening date\/time:<\/b><\/u>On 02\/03\/2021 at 15:30 Hrs (IST)<br \/>\n<u><b>Pre-bid meeting date\/time:<\/b><\/u>28\/01\/2021 at 12:00 Hrs (IST)<\/td>\n<td width=\"18%\"><a class=\"download-link\" href=\"https:\/\/www.aegcl.co.in\/wp-content\/uploads\/2021\/02\/1301202113030ERP-SPNERP.pdf\"> 1.SPN<\/a><br \/>\n<a class=\"download-link\" href=\"https:\/\/www.aegcl.co.in\/wp-content\/uploads\/2021\/02\/1301202113030ERP-TenderDocs.zip\"> 2.Tender Documents<\/a><br \/>\n<a class=\"download-link\" href=\"https:\/\/www.aegcl.co.in\/wp-content\/uploads\/2021\/02\/1301202113030ERP-ERPBOQ.xls\"> 3.BoQ<\/a><br \/>\n<a class=\"download-link\" href=\"https:\/\/www.aegcl.co.in\/wp-content\/uploads\/2021\/02\/22012021ERPPREBIDNOTICE.pdf\"> 4.Prebid Notice<\/a><br \/>\n<a class=\"download-link\" href=\"https:\/\/www.aegcl.co.in\/wp-content\/uploads\/2021\/02\/050220211511ERPBidSubmissionStartExtn-I-1.pdf\"> 5.Corrigendum-I regarding Bid submission start date\/time.<\/a><\/td>\n<td width=\"20%\"><\/td>\n<\/tr>\n<tr>\n<th scope=\"row\">12<\/th>\n<td width=\"35%\"><b><u> Tender No: AEGCL\/MD\/AIIB\/PACKAGE-M\/2020\/02-M(R1)<\/u><\/b><br \/>\nAUGMENTATION OF THE COMMUNICATION BACKBONE-REPLACEMENT OF THE EXISTING GROUND WIRE BY OPGW (636km) (Package-M)<\/td>\n<td width=\"33%\"><u><b>Tender start date:<\/b><\/u>27.11.2020<br \/>\n<u><b>Tender end date\/time:<\/b><\/u> 01.01.2021 till 14:00 Hrs<br \/>\n<u><b>Tender Opening date\/time:<\/b><\/u>02.01.2021 at 15:00 Hrs<br \/>\n<u><b>Pre-bid meeting date\/time:<\/b><\/u> 07.12.2020 at 14:00 Hrs.<\/td>\n<td width=\"18%\"><a class=\"download-link\" href=\"https:\/\/www.aegcl.co.in\/wp-content\/uploads\/2021\/01\/271120201720-aiib-pkg-M-IFBMRI.pdf\"> 1.NIT<\/a><br \/>\n<a class=\"download-link\" href=\"https:\/\/www.aegcl.co.in\/wp-content\/uploads\/2021\/01\/271120201720-aiib-pkg-M-IFBMRI.pdf\"> 2.Tender Documents<\/a><br \/>\n<a class=\"download-link\" href=\"https:\/\/www.aegcl.co.in\/wp-content\/uploads\/2021\/01\/101220201620-aiib-PreBidMinutesPackageM-R1-1.pdf\"> 3.Prebid MoM<\/a><\/td>\n<td width=\"20%\"><\/td>\n<\/tr>\n<tr>\n<th scope=\"row\">11<\/th>\n<td><b><u>NIT NO:AEGCL\/MD\/AIIB\/PACKAGE E\/2020\/02-E<\/u><\/b><br \/>\nConstruction of 220\/132 kV, 2X160MVA at two location (Sankardevnagar &amp; Agamoni) and its associated lines and bay extension (Package-E)<\/td>\n<td><u><b>Tender start date:<\/b><\/u>16.10.2020<br \/>\n<u><b>Pre-bid meeting date\/time:<\/b><\/u> 03.11.2020 at 14:00 hrs.<br \/>\n<u><b>Submission end date:<\/b><\/u> 07.01.2020 till 13:00 Hrs.<br \/>\n<u><b>Tender Opening date\/time:<\/b><\/u> 08.01.2020 at 15:00 Hrs.<\/td>\n<td><a class=\"download-link\" href=\"https:\/\/www.aegcl.co.in\/wp-content\/uploads\/2021\/01\/191020201318-aiib-pkg-D-E-Tendernotice.pdf\"> 1.NIT<\/a><br \/>\n<a class=\"download-link\"> 2.Bid Document<\/a><br \/>\n<a class=\"download-link\" href=\"https:\/\/www.aegcl.co.in\/wp-content\/uploads\/2021\/01\/11012020-aiib-Prebid_notice-pkg-D-E.pdf\"> 3.Prebid Meeting Notice<\/a><br \/>\n<a class=\"download-link\"  href=\"https:\/\/www.aegcl.co.in\/wp-content\/uploads\/2021\/02\/271120201710-aiib-PKG_E-3.zip\"> 4.Corrigendum-I<\/a><br \/>\n<a class=\"download-link\" href=\"https:\/\/www.aegcl.co.in\/wp-content\/uploads\/2021\/01\/071220201303aiib-Corrigendum-III-PKG-E.pdf\"> 5.Corrigendum-II<\/a><br \/>\n<a class=\"download-link\" href=\"https:\/\/www.aegcl.co.in\/wp-content\/uploads\/2021\/02\/060120211221AIIBCorrigendumIVPKGE.pdf\"> 6.Time Extension-I<\/a><br \/>\n<a class=\"download-link\" href=\"https:\/\/www.aegcl.co.in\/wp-content\/uploads\/2021\/02\/07012021115aiib-CORRIGENDUMVPKGE.pdf\"> 7.Corrigendum-III<\/a><\/td>\n<td><\/td>\n<\/tr>\n<tr>\n<th scope=\"row\">10<\/th>\n<td><b><u> NIT NO:AEGCL\/MD\/AIIB\/PACKAGE D\/2020\/02-D<\/u><\/b><br \/>\nConstruction of 220\/132 kV, 2X160MVA;<br \/>\n132\/33 kV, 2X50 MVA GIS at locatoin (Khumtai) and its associated lines and bay extension (Package-D)<\/td>\n<td><u><b>Tender start date: <\/b><\/u>16.10.2020<br \/>\n<u><b>Pre-bid meeting date\/time:<\/b><\/u> 03.11.2020 at 14:00 hrs.<br \/>\n<u><b>Submission end date:<\/b><\/u> 07.01.2020 till 13:00 Hrs.<br \/>\n<u><b>Tender Opening date\/time:<\/b><\/u> 08.01.2020 at 15:00 Hrs.<\/td>\n<td><a class=\"download-link\" href=\"https:\/\/www.aegcl.co.in\/wp-content\/uploads\/2021\/01\/191020201318-aiib-pkg-D-E-Tendernotice-1.pdf\"> 1.NIT<\/a><br \/>\n<a class=\"download-link\"> 2.Tender Document<\/a><br \/>\n<a class=\"download-link\" href=\"https:\/\/www.aegcl.co.in\/wp-content\/uploads\/2021\/01\/11012020-aiib-Prebid_notice-pkg-D-E-1.pdf\"> 3.Prebid Meeting Notice<\/a><br \/>\n<a class=\"download-link\"> 4.Corrigendum-I<\/a><br \/>\n<a class=\"download-link\" href=\"https:\/\/www.aegcl.co.in\/wp-content\/uploads\/2021\/01\/071220201303aiib-Corrigendum-III-PKG-D.pdf\"> 5.Corrigendum-II<\/a><\/td>\n<td><\/td>\n<\/tr>\n<tr>\n<th scope=\"row\">9<\/th>\n<td><b><u>Tender No:AEGCL\/MD\/AIIB\/PACKAGE-M\/2020\/02-M(R)<\/u><\/b><br \/>\nAUGMENTATION OF THE COMMUNICATION BACKBONE-REPLACEMENT OF THE EXISTING GROUND WIRE BY OPGW (636km) (Package-M)<\/td>\n<td><u><b>Tender start date:<\/b><\/u>16.10.2020<br \/>\n<u><b>Pre-bid meeting date\/time:<\/b><\/u> 03.11.2020 at 14:00 hrs.<br \/>\n<u><b>Submission end date:<\/b><\/u> 07.01.2020 till 13:00 Hrs.<br \/>\n<u><b>Tender Opening date\/time:<\/b><\/u> 08.01.2020 at 15:00 Hrs.<\/td>\n<td><a class=\"download-link\" href=\"https:\/\/www.aegcl.co.in\/wp-content\/uploads\/2021\/01\/280920201040-aiib-pkg-M-NoticePkgM.pdf\"> 1.NIT<\/a><br \/>\n<a class=\"download-link\"> 2.Bid Document<\/a><br \/>\n<a class=\"download-link\" href=\"https:\/\/www.aegcl.co.in\/wp-content\/uploads\/2021\/01\/031020201953-aiib-pkg-m-prebid-vc-1.pdf\"> 3.Prebid Meeting Notice<\/a><br \/>\n<a class=\"download-link\" href=\"https:\/\/www.aegcl.co.in\/wp-content\/uploads\/2021\/01\/13102020-aiib-MINUTES_OF_PREBID__06.10.2020__PKG_M_R_.pdf\"> 4.MoM-Prebid<\/a><br \/>\n<a class=\"download-link\" href=\"https:\/\/www.aegcl.co.in\/wp-content\/uploads\/2021\/01\/13102020-aiib-MINUTES_OF_PREBID__06.10.2020__PKG_M_R_.pdf\"> 5.Addendum-I<\/a><br \/>\n<a class=\"download-link\" href=\"https:\/\/www.aegcl.co.in\/wp-content\/uploads\/2021\/01\/051120201050aiib-CorrigendumPackageM.pdf\"> 6.Extension-I<\/a><\/td>\n<td><a href=\"https:\/\/www.aegcl.co.in\/wp-content\/uploads\/2021\/01\/251120201544-aiib-pkg-M-CancellationNotice.pdf\">Tender Cancelled.<\/a><\/td>\n<\/tr>\n<tr>\n<th scope=\"row\">8<\/th>\n<td><b><u> Tender No:AEGCL\/MD\/AIIB\/PACKAGE A\/2020\/02-A<\/u><\/b><br \/>\nCONSTRUCTION OF 220\/33KV, 2X100 MVA GIS AT TWO LOCATIONS (BIHPURIA &amp; JAKHALABANDHA) AND ASSOCIATED TRANSMISSION LINES PACKAGE A)<\/td>\n<td><u><b>Pre-tender meeting date\/time:<\/b><\/u> 10.06.2020 at 14:00 Hrs.<br \/>\n<u><b>Start date and time:<\/b><\/u> 16.00 hrs. of 04. 08. 2020<br \/>\n<u><b>End date and time:<\/b><\/u>13:00 hrs. of 13. 08.2020<br \/>\n<u><b>Opening date and time:<\/b><\/u>12:00 hrs. of 14.08.2020.<\/td>\n<td><a class=\"download-link\" href=\"https:\/\/www.aegcl.co.in\/wp-content\/uploads\/2021\/01\/010420201734aiib-Package-A-IFB.pdf\"> 1.IFB<\/a><br \/>\n<a class=\"download-link\"> 2.Tender Documents<\/a><br \/>\n<a class=\"download-link\" href=\"https:\/\/www.aegcl.co.in\/wp-content\/uploads\/2021\/01\/200420201016AIIB-Corrigendum_1_PKG_A.pdf\"> 3.Corrigendum-TimeExtn-I<\/a><br \/>\n<a class=\"download-link\" href=\"https:\/\/www.aegcl.co.in\/wp-content\/uploads\/2021\/01\/040520201300Notice_BOQ_Update.pdf\"> 4.Notice_BoQ_Change<\/a><br \/>\n<a class=\"download-link\" href=\"https:\/\/www.aegcl.co.in\/wp-content\/uploads\/2021\/01\/050520201109BOQ_26523_PKG_A.xls\"> 5.Revised BoQ Schedule<\/a><br \/>\n<a class=\"download-link\" href=\"https:\/\/www.aegcl.co.in\/wp-content\/uploads\/2021\/01\/110520201125AIIBCorrigendum_II_PKGA.pdf\"> 6.Corrigendum-II<\/a><br \/>\n<a class=\"download-link\" href=\"https:\/\/www.aegcl.co.in\/wp-content\/uploads\/2021\/01\/210520201131AIIB-Corrigendum_PKG_A.pdf\"> 7.Corrigendum-III<\/a><br \/>\n<a class=\"download-link\" href=\"https:\/\/www.aegcl.co.in\/wp-content\/uploads\/2021\/01\/050620201653PRE_BID_Notice_AIIB.pdf\"> 8.Pre-Bid Meeting Notice<\/a><br \/>\n<a class=\"download-link\" href=\"https:\/\/www.aegcl.co.in\/wp-content\/uploads\/2021\/01\/190620201053-aiib-Corrigendum_IV_PKGA.pdf\"> 9.Corrigendum-IV<\/a><br \/>\n<a class=\"download-link\" href=\"https:\/\/www.aegcl.co.in\/wp-content\/uploads\/2021\/01\/290620201402-aiib-Corrigendum_V_PKG_A.pdf\"> 10.Corrigendum-V<\/a><br \/>\n<a class=\"download-link\" href=\"https:\/\/www.aegcl.co.in\/wp-content\/uploads\/2021\/01\/070720201654-AIIB-ADDENDUMVIPKGA.pdf\"> 11.Addendum<\/a><br \/>\n<a class=\"download-link\" href=\"https:\/\/www.aegcl.co.in\/wp-content\/uploads\/2021\/01\/070720201654-AIIB-MOMPACKAGEA.pdf\"> 12.MoM-Prebid Meeting<\/a><br \/>\n<a class=\"download-link\" href=\"https:\/\/www.aegcl.co.in\/wp-content\/uploads\/2021\/01\/120720201116-aaib-pkg-A-Clarification1.pdf\"> 13.Clarification<\/a><br \/>\n<a class=\"download-link\" href=\"https:\/\/www.aegcl.co.in\/wp-content\/uploads\/2021\/01\/120720201116-aaib-pkg-A-CorrigendumVIIPKGA.pdf\"> 14.Corrigendum-VII<\/a><br \/>\n<a class=\"download-link\" href=\"https:\/\/www.aegcl.co.in\/wp-content\/uploads\/2021\/01\/180720201458-aiib-Corrigendum_VIII_PKGA.pdf\"> 15.Corrigendum-VIII<\/a><br \/>\n<a class=\"download-link\" href=\"https:\/\/www.aegcl.co.in\/wp-content\/uploads\/2021\/01\/060820201120aiib-Package-A.pdf\"> 16.Corrigendum-IX<\/a><br \/>\n<a class=\"download-link\" href=\"https:\/\/www.aegcl.co.in\/wp-content\/uploads\/2021\/01\/060820201118aiib-Clarification.pdf\"> 17.Clarification<\/a><\/td>\n<td><a href=\"https:\/\/www.aegcl.co.in\/wp-content\/uploads\/2021\/01\/221020201628AIIB-NOIA_PKGA.pdf\"><b>1) Notification of Intention to Award the Contract<\/b><\/a><\/td>\n<\/tr>\n<tr>\n<th scope=\"row\">7<\/th>\n<td><b><u>Tender No: AEGCL\/MD\/AIIB\/PACKAGE-M\/2020\/02-M<\/u><\/b><br \/>\nAUGMENTATION OF THE COMMUNICATION BACKBONE-REPLACEMENT OF THE EXISTING GROUND WIRE BY OPGW (636km) (Package-M)<\/td>\n<td><u><b>Pre-tender meeting date\/time:<\/b><\/u> 11.06.2020 at 14:00 Hrs.<br \/>\n<u><b>Start date and time :<\/b><\/u>16.00 hrs. of 04. 08. 2020<br \/>\n<u><b>End date and time:<\/b><\/u>13:00 hrs. of 13. 08.2020<br \/>\n<u><b>Opening date and time : <\/b><\/u>12:00 hrs. of 14.08.2020<\/td>\n<td><a class=\"download-link\" href=\"https:\/\/www.aegcl.co.in\/wp-content\/uploads\/2021\/01\/010420201734aiib-OPGW-IFB.pdf\"> 1.IFB<\/a><br \/>\n<a class=\"download-link\"> 2.Tender Documents<\/a><br \/>\n<a class=\"download-link\" href=\"https:\/\/www.aegcl.co.in\/wp-content\/uploads\/2021\/01\/200420201016AIIB-Corrigendum_1_PKG_M.pdf\"> 3.Corrigendum-TimeExtn-I<\/a><br \/>\n<a class=\"download-link\" href=\"https:\/\/www.aegcl.co.in\/wp-content\/uploads\/2021\/01\/040520201300Notice_BOQ_Update-1.pdf\"> 4.Notice_BoQ_Change<\/a><br \/>\n<a class=\"download-link\" href=\"https:\/\/www.aegcl.co.in\/wp-content\/uploads\/2021\/01\/050520201109BOQ_26522_PKG_M.xls\"> 5.Revised BoQ Schedule<\/a><br \/>\n<a class=\"download-link\" href=\"https:\/\/www.aegcl.co.in\/wp-content\/uploads\/2021\/01\/110520201125AIIBCorrigendum_II_PKG_M.pdf\"> 6.Corrigendum-II<\/a><br \/>\n<a class=\"download-link\" href=\"https:\/\/www.aegcl.co.in\/wp-content\/uploads\/2021\/01\/210520201131AIIBCorrigendum_PKG_M.pdf\"> 7.Corrigendum-III<\/a><br \/>\n<a class=\"download-link\" href=\"https:\/\/www.aegcl.co.in\/wp-content\/uploads\/2021\/01\/050620201653PRE_BID_Notice_AIIB-1.pdf\"> 8.Pre-Bid Meeting Notice<\/a><br \/>\n<a class=\"download-link\" href=\"https:\/\/www.aegcl.co.in\/wp-content\/uploads\/2021\/01\/190620201053-aiib-Corrigendum_IV_PKGM.pdf\"> 9.Corrigendum-IV<\/a><br \/>\n<a class=\"download-link\" href=\"https:\/\/www.aegcl.co.in\/wp-content\/uploads\/2021\/01\/290620201402-aiib-Corrigendum_V_PKG_M.pdf\"> 10.Corrigendum-V<\/a><br \/>\n<a class=\"download-link\" href=\"https:\/\/www.aegcl.co.in\/wp-content\/uploads\/2021\/01\/070720201715-AIIB-PKG-M-ADDENDUMVIM.pdf\"> 11.Addendum<\/a><br \/>\n<a class=\"download-link\" href=\"https:\/\/www.aegcl.co.in\/wp-content\/uploads\/2021\/01\/070720201715-AIIB-PKG-M-MOMPACKAGEM.pdf\"> 12.MoM-Prebid Meeting<\/a><br \/>\n<a class=\"download-link\" href=\"https:\/\/www.aegcl.co.in\/wp-content\/uploads\/2021\/01\/120720201116-aaib-pkg-M-Clarification2.pdf\"> 13.Clarification<\/a><br \/>\n<a class=\"download-link\" href=\"https:\/\/www.aegcl.co.in\/wp-content\/uploads\/2021\/01\/180720201458-aiib-Corrigendum_VII_PKGM.pdf\"> 14.Corrigendum-VII<\/a><br \/>\n<a class=\"download-link\" href=\"https:\/\/www.aegcl.co.in\/wp-content\/uploads\/2021\/01\/060820201120aiib-Package-M.pdf\"> 15.Corrigendum-VIII<\/a><br \/>\n<a class=\"download-link\" href=\"https:\/\/www.aegcl.co.in\/wp-content\/uploads\/2021\/01\/060820201118aiib-Clarification-1.pdf\"> 16.Clarification<\/a><\/td>\n<td>Tender is retendered.<\/td>\n<\/tr>\n<tr>\n<th scope=\"row\">6<\/th>\n<td><b><u> Tender No:AEGCL\/MD\/AIIB\/PACKAGE L\/2020\/02-L<\/u><\/b><br \/>\nAugmentation of Existing Transmission Lines Capacity (Three Lines) by High Temperature Low Sag (HTLS) Conductor (Package L)<\/td>\n<td><u><b>Pre-tender meeting date\/time:<\/b><\/u> 12.06.2020 at 14:00 Hrs.<br \/>\n<u><b>Tender submission start date:<\/b><\/u> 06.07.2020<br \/>\n<u><b>Tender Submission end date\/time:<\/b><\/u> 13th Aug 2020 at 13.00 Hrs<br \/>\n<u><b>Tender opening date\/time:<\/b><\/u> 14th Aug 2020 at 12.00 Hrs<\/td>\n<td><a class=\"download-link\" href=\"https:\/\/www.aegcl.co.in\/wp-content\/uploads\/2021\/01\/060820201118aiib-Clarification-1.pdf\"> 1.IFB<\/a><br \/>\n<a class=\"download-link\"> 2.Tender Documents<\/a><br \/>\n<a class=\"download-link\" href=\"https:\/\/www.aegcl.co.in\/wp-content\/uploads\/2021\/01\/200420201016AIIB-Corrigendum_1_PKG_L.pdf\"> 3.Corrigendum-TimeExtn-I<\/a><br \/>\n<a class=\"download-link\" href=\"https:\/\/www.aegcl.co.in\/wp-content\/uploads\/2021\/01\/110520201125AIIBCorrigendum_II_PKG_L.pdf\"> 4.Corrigendum-II<\/a><br \/>\n<a class=\"download-link\" href=\"https:\/\/www.aegcl.co.in\/wp-content\/uploads\/2021\/01\/210520201131AIIBCorrigendum_PKG_L.pdf\"> 5.Corrigendum-III<\/a><br \/>\n<a class=\"download-link\" href=\"https:\/\/www.aegcl.co.in\/wp-content\/uploads\/2021\/01\/050620201653PRE_BID_Notice_AIIB-2.pdf\"> 6.Pre-Bid Meeting Notice<\/a><br \/>\n<a class=\"download-link\" href=\"https:\/\/www.aegcl.co.in\/wp-content\/uploads\/2021\/01\/190620201053-aiib-Corrigendum_IV_PKGL.pdf\"> 7.Corrigendum-IV<\/a><br \/>\n<a class=\"download-link\" href=\"https:\/\/www.aegcl.co.in\/wp-content\/uploads\/2021\/01\/290620201402-aiib-Corrigendum_V_PKG_L.pdf\"> 8.Corrigendum-V<\/a><br \/>\n<a class=\"download-link\" href=\"https:\/\/www.aegcl.co.in\/wp-content\/uploads\/2021\/01\/070720201713-AIIB-pkg-L-ADDENDUMVIL.pdf\"> 9.Addendum<\/a><br \/>\n<a class=\"download-link\" href=\"https:\/\/www.aegcl.co.in\/wp-content\/uploads\/2021\/01\/070720201713-AIIB-pkg-L-MOMPACKAGEL.pdf\"> 10.MoM-Prebid Meeting<\/a><br \/>\n<a class=\"download-link\" href=\"https:\/\/www.aegcl.co.in\/wp-content\/uploads\/2021\/01\/120720201116-aaib-pkg-L-Clarification2.pdf\"> 11.Clarification<\/a><br \/>\n<a class=\"download-link\" href=\"https:\/\/www.aegcl.co.in\/wp-content\/uploads\/2021\/01\/180720201458-aiib-Corrigendum_VII_PKGL.pdf\"> 12.Corrigendum-VII<\/a><br \/>\n<a class=\"download-link\" href=\"https:\/\/www.aegcl.co.in\/wp-content\/uploads\/2021\/01\/060820201120aiib-Package-L.pdf\"> 13.Corrigendum-VIII<\/a><br \/>\n<a class=\"download-link\" href=\"https:\/\/www.aegcl.co.in\/wp-content\/uploads\/2021\/01\/060820201118aiib-Clarification-2.pdf\"> 14.Clarification<\/a><\/td>\n<td><a href=\"https:\/\/www.aegcl.co.in\/wp-content\/uploads\/2021\/01\/221020201628AIIB-NOIA_PKGL.pdf\"> 1) Notification of Intention to Award the Contract<\/a><\/td>\n<\/tr>\n<tr>\n<th scope=\"row\">5<\/th>\n<td><b><u> Tender No: AEGCL\/MD\/AIIB\/PACKAGE K\/2020\/02-K<\/u><\/b><br \/>\nAUGMENTATION OF EXISTING TRANSFORMER CAPACITY AT VARIOUS SUB STATIONS IN ASSAM (PACKAGE-K)<\/td>\n<td><u><b>Pre-tender meeting date\/time:<\/b><\/u> 10.06.2020 at 14:00 Hrs.<br \/>\n<u><b>Start date and time:<\/b><\/u>16.00 hrs. of 04. 08. 2020<br \/>\n<u><b>End date and time:<\/b><\/u> 13:00 hrs. of 13. 08.2020<br \/>\n<u><b>Opening date and time:<\/b><\/u> 12:00 hrs. of 14.08.2020<\/td>\n<td><a class=\"download-link\" href=\"https:\/\/www.aegcl.co.in\/wp-content\/uploads\/2021\/01\/310320201736Tender_NoticeAIIB.pdf\"> 1.Tender Notice<\/a><br \/>\n<a class=\"download-link\"> 2.Tender Documents<\/a><br \/>\n<a class=\"download-link\" href=\"https:\/\/www.aegcl.co.in\/wp-content\/uploads\/2021\/01\/200420201016AIIB-Corrigendum_1_PKG_K.pdf\"> 3.Corrigendum-TimeExtn-I<\/a><br \/>\n<a class=\"download-link\" href=\"https:\/\/www.aegcl.co.in\/wp-content\/uploads\/2021\/01\/110520201125AIIBCorrigendum_II_PKG_K.pdf\"> 4.Corrigendum-II<\/a><br \/>\n<a class=\"download-link\" href=\"https:\/\/www.aegcl.co.in\/wp-content\/uploads\/2021\/01\/210520201131AIIBCorrigendum_PKG_K.pdf\"> 5.Corrigendum-III<\/a><br \/>\n<a class=\"download-link\" href=\"https:\/\/www.aegcl.co.in\/wp-content\/uploads\/2021\/01\/050620201653PRE_BID_Notice_AIIB-3.pdf\"> 6.Pre-Bid Meeting Notice<\/a><br \/>\n<a class=\"download-link\" href=\"https:\/\/www.aegcl.co.in\/wp-content\/uploads\/2021\/01\/190620201053-aiib-Corrigendum_IV_PKGK.pdf\"> 7.Corrigendum-IV<\/a><br \/>\n<a class=\"download-link\" href=\"https:\/\/www.aegcl.co.in\/wp-content\/uploads\/2021\/01\/290620201402-aiib-Corrigendum_V_PKG_K.pdf\"> 8.Corrigendum-V<\/a><br \/>\n<a class=\"download-link\" href=\"https:\/\/www.aegcl.co.in\/wp-content\/uploads\/2021\/01\/070720201710-aiib-pkg-k-ADDENDUMVIIJK.pdf\"> 9.Addendum<\/a><br \/>\n<a class=\"download-link\" href=\"https:\/\/www.aegcl.co.in\/wp-content\/uploads\/2021\/01\/070720201710-aiib-pkg-k-MOMPACKAGEIJK.pdf\"> 10.MoM-Prebid Meeting<\/a><br \/>\n<a class=\"download-link\"> 11..Additional Information for Bid\/a&gt;<br \/>\n<\/a><a class=\"download-link\"> 12.Layout of Substation<\/a><a class=\"download-link\"><br \/>\n<\/a><a class=\"download-link\" href=\"https:\/\/www.aegcl.co.in\/wp-content\/uploads\/2021\/01\/120720201116-aaib-pkg-K-Clarification2.pdf\"> 13.Clarification<\/a><a class=\"download-link\"><br \/>\n<\/a><a class=\"download-link\" href=\"https:\/\/www.aegcl.co.in\/wp-content\/uploads\/2021\/01\/180720201458-aiib-Corrigendum_VII_PKGK.pdf\"> 14.Corrigendum-VII<\/a><a class=\"download-link\"><br \/>\n<\/a><a class=\"download-link\" href=\"https:\/\/www.aegcl.co.in\/wp-content\/uploads\/2021\/01\/060820201120aiib-Package-K.pdf\"> 15.Corrigendum-VIII<\/a><a class=\"download-link\"><br \/>\n<\/a><a class=\"download-link\" href=\"https:\/\/www.aegcl.co.in\/wp-content\/uploads\/2021\/01\/060820201118aiib-Clarification-3.pdf\"> 16.Clarification<\/a><br \/>\n<a class=\"download-link\" href=\"https:\/\/www.aegcl.co.in\/wp-content\/uploads\/2021\/02\/060820201120aiib-Package-K-1.pdf\"> 17.Corrigendum-VIII<\/a><br \/>\n<a class=\"download-link\" href=\"https:\/\/www.aegcl.co.in\/wp-content\/uploads\/2021\/02\/060820201118aiib-Clarification-7.pdf.pdf\"> 18.Clarification<\/a><\/td>\n<td><a href=\"https:\/\/www.aegcl.co.in\/wp-content\/uploads\/2021\/01\/221020201628AIIB-NOIA_PKGK.pdf\"> 1) Notification of Intention to Award the Contract<\/a><\/td>\n<\/tr>\n<tr>\n<th scope=\"row\">4<\/th>\n<td><b><u>Tender No: AEGCL\/MD\/AIIB\/PACKAGE J\/2020\/02-J<\/u><\/b><br \/>\nAUGMENTATION OF EXISTING TRANSFORMER CAPACITY AT VARIOUS SUBSTATIONS IN ASSAM (PACKAGE-J).<\/td>\n<td><u><b>Pre-tender meeting date\/time: <\/b><\/u> 10.06.2020 at 14:00 Hrs.<br \/>\n<u><b>Start date and time:<\/b><\/u>16.00 hrs. of 04. 08. 2020<br \/>\n<u><b>End date and time:<\/b><\/u> 13:00 hrs. of 13. 08.2020<br \/>\n<u><b>Opening date and time:<\/b><\/u> 12:00 hrs. of 14.08.2020<\/td>\n<td><a class=\"download-link\" href=\"https:\/\/www.aegcl.co.in\/wp-content\/uploads\/2021\/01\/310320201736Tender_NoticeAIIB-1.pdf\"> 1.Tender Notice<\/a><br \/>\n<a class=\"download-link\"> 2.Tender Documents<\/a><br \/>\n<a class=\"download-link\" href=\"https:\/\/www.aegcl.co.in\/wp-content\/uploads\/2021\/01\/200420201016AIIB-Corrigendum_1_PKG_J.pdf\"> 3.Corrigendum-TimeExtn-I<\/a><br \/>\n<a class=\"download-link\" href=\"https:\/\/www.aegcl.co.in\/wp-content\/uploads\/2021\/01\/110520201125AIIBCorrigendum_II_PKG_J.pdf\"> 4.Corrigendum-II<\/a><br \/>\n<a class=\"download-link\"> 5.Corrigendum-III<\/a><br \/>\n<a class=\"download-link\" href=\"https:\/\/www.aegcl.co.in\/wp-content\/uploads\/2021\/01\/050620201653PRE_BID_Notice_AIIB-4.pdf\"> 6.Pre-Bid Meeting Notice<\/a><br \/>\n<a class=\"download-link\" href=\"https:\/\/www.aegcl.co.in\/wp-content\/uploads\/2021\/01\/190620201053-aiib-Corrigendum_IV_PKGJ.pdf\"> 7.Corrigendum-IV<\/a><br \/>\n<a class=\"download-link\" href=\"https:\/\/www.aegcl.co.in\/wp-content\/uploads\/2021\/01\/290620201402-aiib-Corrigendum_V_PKG_J.pdf\"> 8.Corrigendum-V<\/a><br \/>\n<a class=\"download-link\" href=\"https:\/\/www.aegcl.co.in\/wp-content\/uploads\/2021\/01\/070720201654-AIIB-ADDENDUMVIIJK.pdf\"> 9.Addendum<\/a><br \/>\n<a class=\"download-link\" href=\"https:\/\/www.aegcl.co.in\/wp-content\/uploads\/2021\/01\/070720201654-AIIB-MOMPACKAGEIJK.pdf\"> 10.MoM-Prebid Meeting<\/a><br \/>\n<a class=\"download-link\"> 11..Additional Information for Bid\/a&gt;<br \/>\n<\/a><a class=\"download-link\"> 12.Layout of Substation<\/a><a class=\"download-link\"><br \/>\n<\/a><a class=\"download-link\" href=\"https:\/\/www.aegcl.co.in\/wp-content\/uploads\/2021\/01\/120720201116-aaib-pkg-J-Clarification2.pdf\"> 13.Clarification<\/a><a class=\"download-link\"><br \/>\n<\/a><a class=\"download-link\" href=\"https:\/\/www.aegcl.co.in\/wp-content\/uploads\/2021\/01\/180720201458-aiib-Corrigendum_VII_PKGJ.pdf\"> 14.Corrigendum-VII<\/a><a class=\"download-link\"><br \/>\n<\/a><a class=\"download-link\" href=\"https:\/\/www.aegcl.co.in\/wp-content\/uploads\/2021\/01\/060820201120aiib-Package-J.pdf\"> 15.Corrigendum-VIII<\/a><a class=\"download-link\"><br \/>\n<\/a><a class=\"download-link\" href=\"https:\/\/www.aegcl.co.in\/wp-content\/uploads\/2021\/01\/060820201118aiib-Clarification-4.pdf\"> 16.Clarification<\/a><\/td>\n<td><a href=\"https:\/\/www.aegcl.co.in\/wp-content\/uploads\/2021\/01\/221020201628AIIB-NOIA_PKGJ.pdf\"> 1) Notification of Intention to Award the Contract<\/a><\/td>\n<\/tr>\n<tr>\n<th scope=\"row\">3<\/th>\n<td><b><u>Tender No: AEGCL\/MD\/AIIB\/PACKAGE I\/2020\/02-I <\/u><\/b><br \/>\nAUGMENTATION OF EXISTING TRANSFORMER CAPACITY AT VARIOUS SUBSTATIONS IN ASSAM (PACKAGE-I).<\/td>\n<td><u><b>Pre-tender meeting date\/time:<\/b><\/u> 10.06.2020 at 14:00 Hrs.<br \/>\n<u><b>Start date and time:<\/b><\/u>16.00 hrs. of 04. 08. 2020<br \/>\n<u><b>End date and time:<\/b><\/u> 13:00 hrs. of 13. 08.2020<br \/>\n<u><b>Opening date and time:<\/b><\/u> 12:00 hrs. of 14.08.2020<\/td>\n<td><a class=\"download-link\" href=\"https:\/\/www.aegcl.co.in\/wp-content\/uploads\/2021\/01\/310320201736Tender_NoticeAIIB-2.pdf\"> 1.Tender Notice<\/a><br \/>\n<a class=\"download-link\"> 2.Tender Documents<\/a><br \/>\n<a class=\"download-link\" href=\"https:\/\/www.aegcl.co.in\/wp-content\/uploads\/2021\/01\/200420201016AIIB-Corrigendum_1_PKG_I.pdf\"> 3.Corrigendum-TimeExtn-I<\/a><br \/>\n<a class=\"download-link\" href=\"https:\/\/www.aegcl.co.in\/wp-content\/uploads\/2021\/01\/110520201125AIIBCorrigendum_II_PKG_I.pdf\"> 4.Corrigendum-II<\/a><br \/>\n<a class=\"download-link\" href=\"https:\/\/www.aegcl.co.in\/wp-content\/uploads\/2021\/01\/210520201131AIIBCorrigendum_PKG_I.pdf\"> 5.Corrigendum-III<\/a><br \/>\n<a class=\"download-link\" href=\"https:\/\/www.aegcl.co.in\/wp-content\/uploads\/2021\/01\/050620201653PRE_BID_Notice_AIIB-5.pdf\"> 6.Pre-Bid Meeting Notice<\/a><br \/>\n<a class=\"download-link\" href=\"https:\/\/www.aegcl.co.in\/wp-content\/uploads\/2021\/01\/190620201053-aiib-Corrigendum_IV_PKGI.pdf\"> 7.Corrigendum-IV<\/a><br \/>\n<a class=\"download-link\" href=\"https:\/\/www.aegcl.co.in\/wp-content\/uploads\/2021\/01\/290620201402-aiib-Corrigendum_V_PKG_I.pdf\"> 8.Corrigendum-V<\/a><br \/>\n<a class=\"download-link\" href=\"https:\/\/www.aegcl.co.in\/wp-content\/uploads\/2021\/01\/070720201654-AIIB-ADDENDUMVIIJK-1.pdf\"> 9.Addendum<\/a><br \/>\n<a class=\"download-link\" href=\"https:\/\/www.aegcl.co.in\/wp-content\/uploads\/2021\/01\/070720201654-AIIB-MOMPACKAGEIJK-1.pdf\"> 10.MoM-Prebid Meeting<\/a><br \/>\n<a class=\"download-link\"> 11..Additional Information for Bid\/a&gt;<br \/>\n<\/a><a class=\"download-link\"> 12.Layout of Substation<\/a><a class=\"download-link\"><br \/>\n<\/a><a class=\"download-link\" href=\"https:\/\/www.aegcl.co.in\/wp-content\/uploads\/2021\/01\/120720201116-aaib-pkg-I-Clarification2.pdf\"> 13.Clarification<\/a><a class=\"download-link\"><br \/>\n<\/a><a class=\"download-link\" href=\"https:\/\/www.aegcl.co.in\/wp-content\/uploads\/2021\/01\/180720201458-aiib-Corrigendum_VII_PKGI.pdf\"> 14.Corrigendum-VII<\/a><a class=\"download-link\"><br \/>\n<\/a><a class=\"download-link\" href=\"https:\/\/www.aegcl.co.in\/wp-content\/uploads\/2021\/01\/060820201120aiib-Package-I-1.pdf\"> 15.Corrigendum-VIII<\/a><a class=\"download-link\"><br \/>\n<\/a><a class=\"download-link\" href=\"https:\/\/www.aegcl.co.in\/wp-content\/uploads\/2021\/01\/060820201120aiib-Package-I-2.pdf\"> 16.Clarification<\/a><\/td>\n<td><a href=\"https:\/\/www.aegcl.co.in\/wp-content\/uploads\/2021\/01\/221020201628AIIB-NOIA_PKGI.pdf\">1) Notification of Intention to Award the Contract<\/a><\/td>\n<\/tr>\n<tr>\n<th scope=\"row\">2<\/th>\n<td><b><u> Tender No:AEGCL\/MD\/AIIB\/PACKAGE C\/2020\/02-C<\/u><\/b><br \/>\nCONSTRUCTION OF 132\/33KV, 2X50 MVA GIS AT LOCATION BURHIGAON AND ASSOCIATED TRANSMISSION LINES (PACKAGE C)<\/td>\n<td><u><b>Pre-tender meeting date\/time:<\/b><\/u> 10.06.2020 at 14:00 Hrs.<br \/>\n<u><b>Start date and time:<\/b><\/u>16.00 hrs. of 04. 08. 2020<br \/>\n<u><b>End date and time:<\/b><\/u> 13:00 hrs. of 13. 08.2020<br \/>\n<u><b>Opening date and time:<\/b><\/u> 12:00 hrs. of 14.08.2020<\/td>\n<td><a class=\"download-link\" href=\"https:\/\/www.aegcl.co.in\/wp-content\/uploads\/2021\/01\/310320201736Tender_NoticeAIIB-3.pdf\"> 1.Tender Notice<\/a><br \/>\n<a class=\"download-link\"> 2.Tender Documents<\/a><br \/>\n<a class=\"download-link\" href=\"https:\/\/www.aegcl.co.in\/wp-content\/uploads\/2021\/01\/200420201016AIIB-Corrigendum_1_PKG_C.pdf\"> 3.Notice_BoQ_Change<\/a><br \/>\n<a class=\"download-link\" href=\"https:\/\/www.aegcl.co.in\/wp-content\/uploads\/2021\/01\/040520201300Notice_BOQ_Update-2.pdf\"> 4.Corrigendum-II<\/a><br \/>\n<a class=\"download-link\" href=\"https:\/\/www.aegcl.co.in\/wp-content\/uploads\/2021\/01\/050520201109BOQ_26483_PKG_C.xls\"> 5.Revised BoQ Schedule<\/a><br \/>\n<a class=\"download-link\" href=\"https:\/\/www.aegcl.co.in\/wp-content\/uploads\/2021\/01\/210520201131AIIBCorrigendum_PKG_C.pdf\"> 6.Corrigendum-II<\/a><br \/>\n<a class=\"download-link\" href=\"https:\/\/www.aegcl.co.in\/wp-content\/uploads\/2021\/01\/210520201131AIIBCorrigendum_PKG_C-1.pdf\"> 7.Corrigendum-III<\/a><br \/>\n<a class=\"download-link\" href=\"https:\/\/www.aegcl.co.in\/wp-content\/uploads\/2021\/01\/050620201653PRE_BID_Notice_AIIB-6.pdf\"> 8.Pre-Bid Meeting Notice<\/a><br \/>\n<a class=\"download-link\" href=\"https:\/\/www.aegcl.co.in\/wp-content\/uploads\/2021\/01\/190620201053-aiib-Corrigendum_IV_PKGC.pdf\"> 9.Corrigendum-IV<\/a><br \/>\n<a class=\"download-link\" href=\"https:\/\/www.aegcl.co.in\/wp-content\/uploads\/2021\/01\/290620201402-aiib-Corrigendum_V_PKG_C.pdf\"> 10.Corrigendum-V<\/a><br \/>\n<a class=\"download-link\" href=\"https:\/\/www.aegcl.co.in\/wp-content\/uploads\/2021\/01\/070720201654-AIIB-AddendumVIPKGBC.pdf\"> 11.Addendum\/a&gt;<br \/>\n<\/a><a class=\"download-link\" href=\"https:\/\/www.aegcl.co.in\/wp-content\/uploads\/2021\/01\/070720201654-AIIB-MOMPKGBC.pdf\"> 12.MoM-Prebid Meeting<\/a><a class=\"download-link\" href=\"https:\/\/www.aegcl.co.in\/wp-content\/uploads\/2021\/01\/070720201654-AIIB-AddendumVIPKGBC.pdf\"><br \/>\n<\/a><a class=\"download-link\" href=\"https:\/\/www.aegcl.co.in\/wp-content\/uploads\/2021\/01\/120720201116-aaib-pkg-C-Clarification2.pdf\"> 13.Clarification<\/a><a class=\"download-link\" href=\"https:\/\/www.aegcl.co.in\/wp-content\/uploads\/2021\/01\/070720201654-AIIB-AddendumVIPKGBC.pdf\"><br \/>\n<\/a><a class=\"download-link\" href=\"https:\/\/www.aegcl.co.in\/wp-content\/uploads\/2021\/01\/120720201116-aaib-pkg-C-CorrigendumVIIPKGC.pdf\"> 14.Corrigendum-VI<\/a><a class=\"download-link\" href=\"https:\/\/www.aegcl.co.in\/wp-content\/uploads\/2021\/01\/070720201654-AIIB-AddendumVIPKGBC.pdf\"><br \/>\n<\/a><a class=\"download-link\" href=\"https:\/\/www.aegcl.co.in\/wp-content\/uploads\/2021\/01\/180720201458-aiib-Corrigendum_VIII_PKGC.pdf\"> 15.Corrigendum-VIII<\/a><a class=\"download-link\" href=\"https:\/\/www.aegcl.co.in\/wp-content\/uploads\/2021\/01\/070720201654-AIIB-AddendumVIPKGBC.pdf\"><br \/>\n<\/a><a class=\"download-link\" href=\"https:\/\/www.aegcl.co.in\/wp-content\/uploads\/2021\/01\/060820201120aiib-Package-C.pdf\"> 16.Corrigendum-IX<\/a><a class=\"download-link\" href=\"https:\/\/www.aegcl.co.in\/wp-content\/uploads\/2021\/01\/070720201654-AIIB-AddendumVIPKGBC.pdf\"><br \/>\n<\/a><a class=\"download-link\" href=\"https:\/\/www.aegcl.co.in\/wp-content\/uploads\/2021\/01\/060820201118aiib-Clarification-5.pdf\"> 17.Clarification<\/a><\/td>\n<td><a href=\"https:\/\/www.aegcl.co.in\/wp-content\/uploads\/2021\/01\/221020201628AIIB-NOIA_PKGC.pdf\">1) Notification of Intention to Award the Contract<\/a><\/td>\n<\/tr>\n<tr>\n<th scope=\"row\">1<\/th>\n<td><b><u>Tender No:AEGCL\/MD\/AIIB\/PACKAGE B\/2020\/02-B<\/u><\/b><br \/>\nCONSTRUCTION OF 220\/33KV, 2X100 MVA GIS AT TWO LOCATIONS (NAGAON-2 &amp; CHAYGAON) AND ASSOCIATED TRANSMISSION LINES (PACKAGE B)<\/td>\n<td><u><b>Pre-tender meeting date\/time:<\/b><\/u> 10.06.2020 at 14:00 Hrs.<br \/>\n<u><b>Start date and time:<\/b><\/u>16.00 hrs. of 04. 08. 2020<br \/>\n<u><b>End date and time:<\/b><\/u> 13:00 hrs. of 13. 08.2020<br \/>\n<u><b>Opening date and time:<\/b><\/u> 12:00 hrs. of 14.08.2020<\/td>\n<td><a class=\"download-link\" href=\"https:\/\/www.aegcl.co.in\/wp-content\/uploads\/2021\/01\/310320201736Tender_NoticeAIIB-4.pdf\"> 1.Tender Notice<\/a><br \/>\n<a class=\"download-link\"> 2.Tender Documents<\/a><br \/>\n<a class=\"download-link\" href=\"https:\/\/www.aegcl.co.in\/wp-content\/uploads\/2021\/01\/200420201016AIIB-Corrigendum_1_PKG_B.pdf\"> 3.Corrigendum-TimeExtn-I<\/a><br \/>\n<a class=\"download-link\" href=\"https:\/\/www.aegcl.co.in\/wp-content\/uploads\/2021\/01\/040520201300Notice_BOQ_Update-3.pdf\"> 4.Notice_BoQ_Change<\/a><br \/>\n<a class=\"download-link\" href=\"https:\/\/www.aegcl.co.in\/wp-content\/uploads\/2021\/01\/050520201109BOQ_26482_PKG_B.xls\"> 5.Revised BoQ Schedule<\/a><br \/>\n<a class=\"download-link\" href=\"https:\/\/www.aegcl.co.in\/wp-content\/uploads\/2021\/01\/110520201125AIIBCorrigendum_II_PKG_B.pdf\"> 6.Corrigendum-II<\/a><br \/>\n<a class=\"download-link\" href=\"https:\/\/www.aegcl.co.in\/wp-content\/uploads\/2021\/01\/210520201131AIIBCorrigendum_PKG_B.pdf\"> 7.Corrigendum-III<\/a><br \/>\n<a class=\"download-link\" href=\"https:\/\/www.aegcl.co.in\/wp-content\/uploads\/2021\/01\/050620201653PRE_BID_Notice_AIIB-7.pdf\"> 8.Pre-Bid Meeting Notice<\/a><br \/>\n<a class=\"download-link\" href=\"https:\/\/www.aegcl.co.in\/wp-content\/uploads\/2021\/01\/190620201053-aiib-Corrigendum_IV_PKGB.pdf\"> 9.Corrigendum-IV<\/a><br \/>\n<a class=\"download-link\" href=\"https:\/\/www.aegcl.co.in\/wp-content\/uploads\/2021\/01\/290620201402-aiib-Corrigendum_V_PKG_B.pdf\"> 10.Corrigendum-V<\/a><br \/>\n<a class=\"download-link\" href=\"https:\/\/www.aegcl.co.in\/wp-content\/uploads\/2021\/01\/070720201654-AIIB-AddendumVIPKGBC-1.pdf\"> 11.Addendum<\/a><br \/>\n<a class=\"download-link\" href=\"https:\/\/www.aegcl.co.in\/wp-content\/uploads\/2021\/01\/070720201654-AIIB-MOMPKGBC-1.pdf\"> 12.MoM-Prebid Meeting<\/a><br \/>\n<a class=\"download-link\"> 13.Revised Drawing for Nagaon-2<\/a><br \/>\n<a class=\"download-link\" href=\"https:\/\/www.aegcl.co.in\/wp-content\/uploads\/2021\/01\/120720201116-aaib-pkg-B-Clarification2.pdf\"> 14.Clarification<\/a><br \/>\n<a class=\"download-link\" href=\"https:\/\/www.aegcl.co.in\/wp-content\/uploads\/2021\/01\/120720201116-aaib-pkg-B-CorrigendumVIIPKGB.pdf\"> 15.Corrigendum-VII<\/a><br \/>\n<a class=\"download-link\" href=\"https:\/\/www.aegcl.co.in\/wp-content\/uploads\/2021\/01\/180720201458-aiib-Corrigendum_VIII_PKGB.pdf\"> 16.Corrigendum-VIII<\/a><br \/>\n<a class=\"download-link\" href=\"https:\/\/www.aegcl.co.in\/wp-content\/uploads\/2021\/01\/060820201120aiib-Package-B.pdf\"> 17.Corrigendum-IX<\/a><br \/>\n<a class=\"download-link\" href=\"https:\/\/www.aegcl.co.in\/wp-content\/uploads\/2021\/01\/060820201118aiib-Clarification-6.pdf\"> 18.Clarification<\/a><\/td>\n<td><b><a href=\"https:\/\/www.aegcl.co.in\/wp-content\/uploads\/2021\/01\/221020201628AIIB-NOIA_PKGB.pdf\">1) Notification of Intention to Award the Contract<\/a><\/b><\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n","protected":false},"excerpt":{"rendered":"<p>Sl. No. Tender Details Key Dates Download Remarks 13 RFB NO:AEGCL\/AIIB\/ERP\/PACKAGE-N1\/38 Dated. 13\/01\/2021 Procurement of Supply, Configuration, Integration, Installation, Implementation &amp; Support of ERP Software (hereafter ERP System) for AEGCL, Assam, India. Tender start date:13.01.2021 Tender end date\/time:On or before 01\/03\/2021 15:00 Hrs (IST) Tender Opening date\/time:On 02\/03\/2021 at 15:30 Hrs (IST) Pre-bid meeting date\/time:28\/01\/2021 [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"template\/innerpage-wirhout-sidebar.php","meta":{"_acf_changed":false,"footnotes":""},"class_list":["post-124","page","type-page","status-publish","hentry"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.aegcl.co.in\/as\/wp-json\/wp\/v2\/pages\/124","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.aegcl.co.in\/as\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.aegcl.co.in\/as\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.aegcl.co.in\/as\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.aegcl.co.in\/as\/wp-json\/wp\/v2\/comments?post=124"}],"version-history":[{"count":5,"href":"https:\/\/www.aegcl.co.in\/as\/wp-json\/wp\/v2\/pages\/124\/revisions"}],"predecessor-version":[{"id":2138,"href":"https:\/\/www.aegcl.co.in\/as\/wp-json\/wp\/v2\/pages\/124\/revisions\/2138"}],"wp:attachment":[{"href":"https:\/\/www.aegcl.co.in\/as\/wp-json\/wp\/v2\/media?parent=124"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}